Project portfolio

Bridges

Western Region Bridge Rehabilitation — Routes 1 & 480

Western Region Bridge Rehabilitation — Routes 1 & 480

Bridge rehabilitation project covering four structures in western Newfoundland: Lloyd's River Bridge, Dry Pond Brook Bridge and Burnt Pond Brook Bridge on Route 480, together with Crabbes River Bridge on Route 1.

Marathon Gold - Victoria River Bridge

Marathon Gold - Victoria River Bridge

Design, supply and installation of a new 120-foot modular bridge at Victoria River along the site access road. Following assessment of the existing bridge and foundations, the structure was determined unsuitable for repair to CL625 road standards. JCL coordinated the new foundation and bridge design, removed the existing structure by tandem crane lift, and installed the replacement bridge using a launching nose.

Replacement of Aspen Brook Bridge

Replacement of Aspen Brook Bridge

Complete replacement of Aspen Brook Bridge in Newfoundland and Labrador's Central Region. The work included demolition of the existing structure, unwatering systems, precast concrete elements, grading and paving on Route 1, and maintenance of the bridge diversion during construction.

Southeast Brook Bridge

Southeast Brook Bridge

Replacement of Southeast Brook Bridge in Gros Morne National Park, including a paved temporary bypass with a 140-foot clear-span panel bridge. The permanent fully integral structure includes piled foundations supporting a 39 m clear-span New England Bulb Tee (NEBT 1800) concrete girder superstructure with concrete abutments and deck.

Sir Robert Bond Bridge

Sir Robert Bond Bridge

Replacement of the Sir Robert Bond Bridge, a key component of Newfoundland and Labrador's transportation network and the east-west highway crossing of the Exploits River.

Sandy Lake Narrows Bridge

Sandy Lake Narrows Bridge

Complete replacement of the three-span concrete girder bridge over Sandy Lake Narrows on Route 401 near Howley. The replacement structure used two 75 m span trapezoidal steel box girders launched into position on concrete abutments.

E.S. Spencer Bridge

E.S. Spencer Bridge

Complete replacement of a three-span concrete girder bridge over the federally scheduled Terra Nova River. The replacement structure consisted of two 75 m span trapezoidal steel box girders launched into position on concrete abutments.

Robinsons River Bridge

Robinsons River Bridge

Construction of a two-lane, two-span, 76 m prestressed concrete girder bridge and associated approaches at Robinsons River on Route 1 near kilometre 800.

Kenamu Bridge

Kenamu Bridge

Supply and installation of an 81 m single-span, two-lane galvanized steel truss bridge across the Kenamu River on Route 500, the Trans-Labrador Highway, near kilometre 62.75. The work included site batching approximately 1,500 m³ of concrete for the abutments and launching the 81 m bridge span after assembly on shore.

North Branch Trailway Bridge

North Branch Trailway Bridge

Removal of the existing North Branch T'railway Bridge superstructure and installation of a 180-foot steel panel bridge over the North Branch River.

Flat Bay Bridge

Flat Bay Bridge

Construction of a two-lane, single-span, 46 m prestressed concrete girder bridge and approaches at Flat Bay on the Trans-Canada Highway near kilometre 772.6. The work included driven H-pile foundations, construction of the 46 m concrete girders on site, and removal of the existing bridge.

Searston Gut Bridge

Searston Gut Bridge

Removal and salvage of a 152.2 m single-lane panel bridge over the Codroy River at Searston Gut on Route 407 near kilometre 10.48.